Article Image

IPFS News Link • Transportation: Air Travel

World's largest commercial aircraft engine fired up for the first time

• http://www.gizmag.com, David Szondy

ccording to GE, ground testing of the GE9X development engine will enable data to be gathered on the engine's overall and aerodynamic performance, mechanical verification, and aero-thermal system validation leading up to flight testing and certification before entering service at the end the decade.

With a front fan spreading a full 11 ft (3.35 m), the GE9X is a world record holder and generates thrust in the order of 100,000 lb. To accommodate the aeronautical behemoth, the Peebles facility was recently upgraded with a larger air intake, extra fuel tanks to feed the giant engine, and high temperature gear to deal with the hotter, more efficient design.

GE says that the GE9X is currently undergoing its first Full Engine To Test (FETT). This is the next level of the test series, which began in 2011 at the component level, and marks the first test of the complete system, which comes only six months after the engine design was finalized. GE says that this relatively early testing was to ensure that the test data was available as soon as possible for the certification engines, which are scheduled to be installed in GE Aviation's flying test bed for certification of flight testing in 2018.


thelibertyadvisor.com/declare